5,816 research outputs found

    Questioning the relentless shift to offshore manufacturing

    Get PDF
    The last 20 years has seen a relentless shift to offshore manufacturing as retailers chase ever-lower labor costs. The results of this strategy can now be evaluated and we propose that some adjustments are in order. We analyze the case of a North American apparel manufacturer (Griffin Manufacturing, Inc.) that has successfully emerged from a period of major change with a strong and strategic position in the apparel supply chain. This case study documents Griffin’s survival through evolution in capabilities, technology, and especially attitude. The Griffin case study suggests that keeping a portion of the manufacturing onshore at an agile, quick response factory is cost effective: it increases sales and improves margins. However, the new relationship between the parties is much more complex and requires commitment on both sides

    Last planner and critical chain in construction management: comparative analysis

    Get PDF
    This paper endeavours to compare the Last Planner System of production control and the Critical Chain production management method. This comparison is carried out in the context of construction management. The original prescription and the evolution of the practice are examined regarding both approaches, and the similarities and differences are noted. Based on these considerations, gaps in the two approaches are identified and the potential of a synthesis of them is explored

    Systematic innovation and the underlying principles behind TRIZ and TOC

    Get PDF
    Innovative developments in the design of product and manufacturing systems are often marked by simplicity, at least in retrospect, that has previously been shrouded by restrictive mental models or limited knowledge transfer. These innovative developments are often associated with the breaking of long established trade-off compromises, as in the paradigm shift associated with JIT & TQM, or the resolution of design contradictions, as in the case of the dual cyclone vacuum cleaner. The rate of change in technology and the commercial environment suggests the opportunity for innovative developments is accelerating, but what systematic support is there to guide this innovation process. This paper brings together two parallel, but independent theories on inventive problem solving; one in mechanical engineering, namely the Russian Theory of Inventive Problem Solving (TRIZ) and the other originating in manufacturing management as the Theory of Constraints (TOC). The term systematic innovation is used to describe the use of common underlying principles within these two approaches. The paper focuses on the significance of trade-off contradictions to innovation in these two fields and explores their relationship with manufacturing strategy development

    New concept in brazing metallic honeycomb panels

    Get PDF
    Aluminum oxide coating provides surface which will not be wetted by brazing alloy and which stops metallic diffusion welding of tooling materials to part being produced. This method eliminates loss of tooling materials and parts from braze wetting and allows fall-apart disassembly of tooling after brazing

    The Pathological Case

    Get PDF

    Preconstruction Plan for a Pedestrian Pathway Rehabilitation Project

    Get PDF
    The Americans with Disabilities Act (ADA) was passed to enforce improvements of public commodities to fill the gaps in our nation\u27s civil rights inequalities for people with disabilities. Public pedestrian pathways are required by federal and state law to comply with ADA guidelines to allow ease of access to individuals with disabilities. Many existing sidewalks and pedestrian pathways have been renovated and modernized to comply with these ADA guidelines. This paper outlines the preconstruction plan for a rehabilitation project of a problematic pedestrian pathway on the campus of California Polytechnic State University, San Luis Obispo, and highlights the need for an ADA compliant improvement though the affected area. The project provides a preconstruction plan of the proposed scope of work which includes, but is not limited to, a preliminary design, critical path schedule, equipment and material quantity take-off, and an initial cost estimate. The purpose of this paper and corresponding preconstruction plan is to bring awareness to this unsafe pedestrian pathway on campus in hopes this project can be continued into the final design phase and then eventually the construction phase
    • 

    corecore